
1
At what stage of my renovation should the plumbing be installed?
Plumbing is typically done in two stages: "First Fix" (installing pipes before walls and floors are finished) and "Second Fix" (connecting sinks, toilets, and taps after tiling and decorating are complete).
Do you provide certificates for your plumbing work?
Yes, all our installations are fully tested and commissioned, and we provide the necessary documentation to ensure compliance with building regulations and insurance requirements.
Can you upgrade my water pressure during a full installation?
Absolutely. We can install unvented cylinders or booster pumps to ensure you have powerful, consistent water pressure in every shower and tap throughout the building.